CRESCENT HEAD OUTFALL
|
|||||||||
|
Click the photograph for a enlarged view |
General Description The original STP consisted of two pasveer channels with a total capacity of 2000 EP. The sewage treatment works has recently been augmented (including the installation of a Tubemaker’s package plant which has a demand aeration tank and an intermittent aeration tank) resulting in an increase in capacity. Sewerage Catchment:
Sewage
Treatment:
Outfall:
|
||||||||||
|
Outfall Site |
|||||||||||
|
Crescent Head |
(Cres_2) Last updated May 2000 |
||||||||||